June 17, 2026
Phase 1 of Trail Work Has Begun
From the trail development archive.
We are very excited to announce that work has begun on the 2.78 mile section of trail starting at Moultonville Road. The NH Trails Bureau and our volunteer groups will be building an 8 ft wide recreation path along the corridor from Moultonville Road to Route 16.
The first phase will be to trench the sides of the trail to drain some of the standing water, then they will rough in a path pulling material from the sides and embankments so that construction equipment can have easy access prior to bringing in the base layer of gravel.
Once this is done, the plan is to spread and compact stone dust to produce a hard smooth surface to make the trail ADA compliant and suitable for cyclists, walkers, joggers and strollers. We are excited for this phase—please watch our Facebook page for updates as well as timing for volunteers to help make this section of trail a reality.
We are planning on marking some trees and will need some volunteers this weekend, June 20, and once we have plans finalized we will post on our Facebook page.
Friends of the Conway Branch Rail Trail
Connecting Ossipee and Conway through outdoor recreation.
PO Box 225
Center Ossipee, NH 03814
E-News
Monthly updates from along the trail.
© 2026 Friends of the Conway Branch Rail Trail. All rights reserved.